<< Click to Display Table of Contents >> Navigation: »No topics above this level« Revisions to Document |
Date |
Description |
Made by |
09/03/2018 |
Discharge Form section updated to include the completion sequence provided by Rob Hayden from Enitial based on his testing. |
Kevin Wilson |
09/03/2018 |
The gas monitoring section was updated to include instructions from Sue Cullum on how to sample at wells with dual sampling taps in the same well. The need arose from the installations at Farnham required in connection with the Earthline planning application to excavate Gault Clay from the quarry and place as a cap on the legacy CEMEX landfill. |
Kevin Wilson |
17/02/2020 |
Updated para 1g and 1h in the water levels section to explain how to deal with plumbs as requested by Sue and Helen |
Kevin Wilson |
26/02/2020 |
Added new para 1i on how to record dry and flooded gauge board observations in EDGE as requested by Helen |
Kevin Wilson |